Skip to main content
Property.ie

7 Waterville Terrace, Waterville, Blanchardstown, Dublin 15, Co. Dublin, D15CF70

2 Bed · 2 Bath · Apartment

€300,000

B E R C
Property typeApartment
Street ViewSatellite View

Highlights

  • Spacious own-door 2-bedroom/2-bathroom ground-floor apartment
  • Located adjacent to a beautifully landscaped public park
  • 1 designated parking spot and communal parking
  • Not overlooked both front and rear
  • Double-glazed uPVC windows
  • Electric heating
  • Close to numerous amenities, including Blanchardstown Shopping Centre
  • Area well-serviced by public transport
  • M50 within a few minutes` drive
  • Management fee approx. €856 p.a. (subject to review and confirmation)

Baxter Real Estate is delighted to present to the market this 2-bedroom/2-bathroom, ground-floor apartment, which extends to approximately 72 sq.m./775 sq.ft. On entering this home, you are welcomed by the entrance hall, with a tiled floor. This leads to a very generous open-plan living and dining room. This light-filled living space features laminate flooring, a feature gas fireplace, and a large picture window, which overlooks the terrace and bathes the room in natural light. Adjacent to this room is the kitchen, which has more than ample wall and base cabinets, a tiled floor and tiled splashback. To the rear, there are two bedrooms, both benefitting from having fitted wardrobes and carpeted floors. The principal bedroom is further enhanced by having an en-suite, with tiled floor and partially-tiled walls. A bathroom, which has a tiled floor and partially tiled walls, completes the accommodation. This property has gas central heating, double-glazed uPVC windows, and a designated parking space. There is also plenty of guest parking in the area. This home is ideally located in the ever-popular, meticulously-maintained, Waterville development. Due to its location in the development, it has the added advantage of not being directly overlooked both front and rear, and it is located just across the road from a beautifully-landscaped public park. It is close to numerous amenities, such as Blanchardstown Shopping Centre, Connolly Hospital, the National Aquatic Centre and Draíocht Arts Centre. Waterville is also located beside the M50, which links to Dublin City Centre and the national road network. Dublin Airport is only a short 15-minute drive away. The area has great transport links: Dublin Bus serves the area with several routes; and Castleknock train station, which provides a regular service to Dublin City Centre on the Maynooth line, and which is due to become part of the DART network, is only a 20-minute walk away. This train line also connects with the Luas network at Broombridge. Please note that all descriptions, dimensions, drone photos, references to condition, and necessary permissions for use and occupation, and other details, are given in good faith and are believed to be correct, but any intending purchaser should not rely on them as statements or representations of fact, but must satisfy themselves, by inspection or otherwise, as to the correctness of each of them. We have not tested any appliances, and all parties must undertake their own investigation into the condition of these appliances and to all other information provided. Entrance Hall - 1.22m (4'0") x 1.12m (3'8") Tiled floor. Living/Dining Room - 5.09m (16'8") x 5.15m (16'11") Laminate flooring, a feature gas fireplace, and a large picture window. Kitchen - 3.22m (10'7") x 2.03m (6'8") More than ample wall and base cabinets, tiled floor and tiled splashback. Main Bedroom - 3.85m (12'8") x 2.81m (9'3") Fitted wardrobes and a carpeted floor. En-suite - 1.84m (6'0") x 1.74m (5'9") Tiled floor and tiled shower cubicle. Bedroom 2 - 3.85m (12'8") x 2.21m (7'3") Fitted wardrobes and a carpeted floor. Bathroom - 2.35m (7'9") x 1.89m (6'2") Tiled floor and partially-tiled walls. Storage cupboard - 0.98m (3'3") x 0.89m (2'11") Carpeted floor. Notice Please note we have not tested any apparatus, fixtures, fittings, or services. Interested parties must undertake their own investigation into the working order of these items. All measurements are approximate and photographs provided for guidance only.

BER Details

B E R C
BER Number119714772
Energy Performance Indicator174.04 kWh/m2/yr
Entered28/10/2026
Last updatedtoday

€300,000

2 Bed · 2 Bath · Apartment

Melissa Roche logo

Melissa Roche

Baxter Real Estate

Estate House

Main Street

Blanchardstown

Dublin 15

PSR Licence No. 004135

Similar properties in the area